Curtain installer quote template South Africa
Whether you are fitting S-wave sheers in a new estate in Midrand, swapping out brittle rails in a Sea Point flat, or quoting motorised tracks where the client “knows someone who can do it cheaper,” your quotation is what defines whether you get paid for a second trip because the reveal was wrong on WhatsApp. This guide covers how South African curtain and blind installers structure quotes — site measure, hardware, labour per opening, take-down and disposal, and the exclusions that stop you drilling into hidden conduit or absorbing an architect's last-minute rail change.
Use the breakdown below, then send the priced document from Plurgo's free quote maker — line items in ZAR, VAT if registered, bank details on the PDF, validity date, and acceptance wording.
What to line-item on a curtain or blind installation quote
A flat fee for “install curtains house” collapses the moment one bay is concrete lintel and another is lightweight bulkhead. Split your offer so the client sees what they are buying:
- Site measure or confirmation of dimensions — separate fee if you measure before manufacture, or state that pricing assumes signed-off sizes supplied by the client / workroom. Mis-measure is the most expensive argument in this trade — name who owns the risk.
- Hardware per opening — track type (standard, wave, corded, hand-draw), length brackets, ceiling vs wall fix, extendable vs cut-to-size poles, passing brackets for wide spans, finials, and any ceiling mount adapters. If the quote is install-only, list “client-supplied hardware” and exclude suitability guarantees for cheap rails.
- Installation labour — per window / sliding door / per linear metre of track, or per room package. Call out double-height voids, stairwells, or ladder work above 2.4 m where you need a second installer or more time.
- Take-down, patch, and disposal — removing old curtains, blinds, or twisted tracks; filling small drill holes if included; removal to landfill or recycling. If excluded, say “strip-out by others.”
- Stack, clearance, and stacking space — note if stacking depth or furniture placement limits how far curtains can draw back — saves you from being blamed for “blocking the view.”
- Optional extras — tie-backs, holdbacks, pelmets, sheer plus blockout double tracks, safety devices on corded systems where relevant, and smart / motorised operators (often with a line that electrical supply or commissioning by a registered electrician is excluded unless itemised).
Supply and install vs fit-only
If you supply fabric and make up, your quote should separate fabric meterage and making from installation, with lead time from deposit and approved sample. If you install only, list the client's responsibility: hardware arrived complete, brackets match substrate, curtains labelled per room. Fit-only jobs go wrong when components are wrong — your quote is where you say you are not the warranty for someone else's purchase.
VAT on curtain installation in South Africa
Registered installers charge 15% VAT on labour and on hardware you supply. Show subtotal, VAT, and total. Interior decorators and homeowners comparing quotes need the same basis — especially off invoices for body corporates that reconcile VAT.
Below the VAT threshold, quote an all-in ZAR figure with no VAT line and state non-registration clearly if corporate clients ask.
Estate rules, access, and making good
Many installs are in complexes with inductions, noise hours, lift protection, and parking vouchers. Either absorb a small admin line or exclude “estate-specific costs” and pass them through — but mention it before you absorb R600 in levies.
Making good — specify whether you touch up drill dust only, fill holes from old brackets, or leave plaster / paint reinstatement to others. Tiled or stone reveals need a note on specialist drill bits and who accepts crack risk.
Payment terms that match how you order
Common structures for custom work:
- Deposit on order — often 40–60% when fabric or imported tracks are committed.
- Balance on installation or snag completion — state when the balance is due (same day vs 7 days).
- Labour-only — payment on completion unless you extend credit to trade accounts — put it in writing.
Warranties and exclusions
State a workmanship period on fixing brackets and operation of installed hardware you supplied. Manufacturer warranty on motors or tracks follows supplier terms — say so.
Typical exclusions worth listing:
- Structural adequacy of ceiling or wall fixings you did not design
- Damage from concealed pipes, cables, or steel in reveals discovered while drilling
- Fading, shrinkage, or cleaning of client-supplied fabric
- Coordination with scaffolding or other trades unless itemised
- Re-hang after painters or tilers disturb brackets — price as a variation
Mistakes that cost curtain installers
- No photo or signed sketch of each opening — the client remembers a different stack side.
- Quoting motorised blinds without power and switch position confirmed — commissioning delays become your fault.
- Accepting WhatsApp sizes from the client's cousin — then eating remake costs.
- Omitting validity on imported component pricing — exchange moves and you are stuck.
- Free take-down on twelve windows — your labour day vanishes.
Create your curtain installation quote online — free
List hardware, labour, and optional extras in ZAR, apply VAT if registered, and send a branded PDF. Installers across South Africa use Plurgo's free quote maker for homes, show houses, and hospitality without rebuilding Word tables every week.
Frequently asked questions
Should a curtain quote include installation and hardware?
Either bundle them with clear subtotals or split “supply” and “install” so the client sees what drives price. Mixed quotes are how you lose a job to a hardware-only online price comparison.
Who is responsible if the track is too short after measuring?
Your quote should state whether you measured or relied on third-party sizes. If you measured, your process should include written sign-off per opening. If the client supplied sizes, the quote should say rework or replacement is quoted separately.
How do I quote blinds vs curtains on the same house?
Separate line groups: roller / Venetian / honeycomb blinds often have different brackets, reveals, and safety considerations than drapes. Do not bury them in one “window treatments” number.
Do curtain installers need to charge VAT in South Africa?
If you are a registered VAT vendor, yes on standard-rated services and goods you supply. If not registered, do not show VAT. Large developers may still engage you — clarity on the quote avoids finance rejection.
More guides: Plumber quote template · Electrician quote template · Building contractor quote template · Painting contractor quote template · Caterer quote template · Private chef quote template · Architect quote template · Town planner quote template · All quote templates